fbpx

SCH has supported a four-day discharge operation to unload sections of two new super post-Panamax gantry cranes at the container facilities of Southampton’s DP World.

The team assisted with hooking up the crane parts as they were off-loaded from the vessel Symphony Sky at 207 berth. Ship’s agents were GP Shipping.

When fully assembled, the new cranes will be taller and wider than the existing cranes on the quay. At their highest point, they will stand at 138 metres (459 foot) tall – as tall as the London Eye – and they will enhance DP World’s ability to handle the latest mega-container ships